The Task Order includes executing proper compliance procedures for aboveground storage tank (AST), underground storage tank (UST), and oil/water separator (OWS) assessment and closure.
CEG provides a qualified heavy equipment operator with OSHA HAZWOPER 40hr and 8hr refresher, confined space entry, and first aid/CPR certifications.
Work at the installation is to include:
Vehicle Maintenance Facility 518
- Remove Unknown UST/OWS
- Close Floor Drains/Install Concrete Berm
Vehicle Maintenance Facility 516
- Repair/Fill-in Hydraulic Lift Sumps
- Remove AST Associated with Hydraulic Lift
Abandoned Railcar Fuel Off-Load Area 49
- Close/Remove 12,000 gallon OWS
Abandoned Oil Pump/Gasoline Dispensing System Pit 733
- Remove Oil Pump/Gasoline Tank Dispensing System
Aircraft Hangar Alternate Aircraft Compressor Wash Facility 746
- Repair/Upgrade OWS by Replacement
Aircraft Hangar Aerial Port 747
- Close OWS in Place
Propulsion Shop 838
- Close OWS 1 in Place
- Close OWS 2 in Place
Air National Guard Vehicle Maintenance Facility 965
- Remove Maintenance Bay OWS and Oil Collection Structure and Install Concrete Berms
- External Wash Rack B965 OWS – Repair/Upgrade by Replacement and Clean associated Piping and Install Grit Trap