Examples of specific results include:
In Westtown Township, we reviewed the existing mapping, identified proposed BMPs which would meet the requirements of the TMDL, and provided cost estimates for the construction of each BMP.
In West Norriton Township, we developed a comprehensive Township-wide GIS inventory of stormwater infrastructure and maintains this database in-house.
In East Brandywine Township, Best Management Practices (BMPs) were proposed and calculated to maximize pollutant load reductions and minimize cost to the Township.
CEG also provides design and feasibility studies for the implementation of the TMDL and Pollutant Reduction Plans.